EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

FERC Accepts Application for 2,200-MW Navajo Energy Storage Station

LCG, January 24, 2020--Daybreak Power Inc. recently announced that the Federal Energy Regulatory Commission (FERC) has accepted the company's application for a preliminary permit for its proposed 2,200-MW Navajo Energy Storage Station (NESS). Achieving this milestone is an important, early step towards approving the project, which is estimated to cost $3.6 billion. The pumped storage hydro system would be located at the U.S. Bureau of Reclamation's (Reclamation) Lake Powell Reservoir on the Colorado River in Arizona.

Read more

NRC Issues Early Site Permit to Tennessee Valley Authority for SMRs at Clinch River Site

LCG, December 27, 2019--The Nuclear Regulatory Commission (NRC) announced on December 17 that the Commission has authorized the issuance of an Early Site Permit (ESP) for Tennessee Valley Authority's (TVA's) Clinch River site near Oak Ridge, Tennessee. The ESP closes several site-related issues, including many environmental impacts, for small modular reactors (SMRs) at the site. The ESP is the first issued by the NRC for SMRs and will be valid for up to 20 years from date of issuance.

Read more

Press Release

2019 ERCOT Outlook report available from LCG Consulting


LCG, January 8, 2019 --Texas continues to see growth in renewable energy resources. In 2018, ERCOT endorsed major transmission projects to serve load growth while relieving congestion in the Far West region. New import and export capabilities are also on the horizon, such as through the integration of Lubbock Power & Light and the possible Southern Cross transmission project.

LCG Consulting (LCG) recently completed a comprehensive hourly simulation of the ERCOT market for 2019 to help stakeholders tackle uncertainties in future ERCOT operations. The Outlook Report outlines future operation of the ERCOT nodal market, including Locational Marginal Prices (LMPs), load zone prices, hub prices and expected congestion. For more in depth analysis, LCG can provide tailored datasets, such as individualized generator performance, hourly prices, and much more.

LCG performed the simulations using the sophisticated and long-standing electricity model, the UPLAN Network Power Model. LCG has been modeling energy systems for more than 30 years and continuously sustains the most up-to-date information on every detail of the Texas grid including minor and major transmission upgrades as well as generation additions and retirement.

For more information on LCG’s products and services, contact Julie Chien at julie.chien@energyonline.com

Copyright © 2020 LCG Consulting. All rights reserved. Terms and Copyright
Generator X
Generation and Transmission Planning and Optimization
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
PowerMax
Day-ahead and real-time portfolio revenue optimization
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
MarketWatch
Annual summary of prices, congestion and important events in ERCOT
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service