EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

LCG Publishes 2024 Annual Outlook for Texas Electricity Market (ERCOT)

LCG, October 10, 2023 – LCG Consulting (LCG) has released its annual outlook of the ERCOT wholesale electricity market for 2024, based on the most likely weather, market, transmission, and generator conditions.

Read more

LCG Publishes 2024 Annual Outlook for Texas Electricity Market (ERCOT)

LCG, October 10, 2023 – LCG Consulting (LCG) has released its annual outlook of the ERCOT wholesale electricity market for 2024, based on the most likely weather, market, transmission, and generator conditions.

Read more

Industry News

Two New Power Plants; One Withdrawn

LCG, April 11, 2001Plans to build one new power plant and ground-breaking for another were announced yesterday, as was the decision by one company to back away from a project because of environmental concerns.

FPL Energy, an unregulated subsidiary of Florida-based FPL Group Inc. said it will build, own and operate a 624 megawatt, natural gas-fired power plant in Calhoun County in northeastern Alabama. Construction of the simple-cycle combustion turbine plant is scheduled to begin later this year, with commercial operation expected in the summer of 2003. The plant's output will be sold mostly to Alabama Power Co., a subsidiary of The Southern Co.

TransAlta Corp. said it broke ground yesterday on a new 248 megawatt natural gas-fired combined-cycle power plant near Centralia, Wash., where TransAlta purchased the 1,340 megawatt Centralia plant and coal mine last year. The new facility, called Big Hanaford, is scheduled to begin commercial operation by July of next year. Washington Gov. Gary Locke was on hand to turn over a spadeful of earth, saying "The citizens need low-cost, environmentally responsible power."

PSEG Power LLC said it has dropped plans to build a power plant in White River Township, Indiana, due to results from an environmental analysis and objections from residents of the township. When local citizens got wind of the White River project, they raised objections to the proposed plant's use of water flow. PSEG said it believed that there was plenty of water for the 500 to 800 megawatt plant but, because of the uncertainty and also because other sites are available on White River the decision to withdraw the pant was made.

"While we believe that the flows would allow us to obtain a permit to construct a combined cyclefacility, the flow rates of the White Water River do not give sufficient margin of comfort for PSEG,especially in light of other possible plants proposed on the river," Lathrop Craig, manager of project development at PSEG Power, said in a statement.

Copyright © 2024 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service