EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

Los Angeles Moves A Step Closer to Approving Huge Solar with Battery Storage Installation

LCG, September 12, 2019--The Los Angeles Department of Water and Power (LADWP) Board of Commissioners unanimously approved a plan on September 10 to install a 300-MW/1,200-MWh battery energy storage system (BESS) located at 8minute Solar Energy's (8mSE) Eland Solar and Storage Center.

Read more

FERC Accepts LNG Permit Application from Commonwealth

LCG, September 4, 2019--Commonwealth Projects, LLC yesterday announced that the Federal Energy Regulatory Commission (FERC) has formally accepted Commonwealth LNG, LLC's filing application to construct one liquefied natural gas (LNG) plant at the mouth of the Gulf of Mexico near Cameron, Louisiana. The company stated that it is on schedule to commence operations in the first quarter of 2024.

Read more

Industry News

States Oppose Sunflower's Proposed Coal-fired Units and Associated Carbon Emissions

LCG, December 19, 2006--Eight states are working together to prevent the construction of three new coal-fired, electric generating units proposed by Sunflower Electric Power Corp. The states acting to block the proposal are California, Connecticut, Delaware, Maine, New York, Rhode Island, Vermont and Wisconsin.

The attorneys general of the eight states submitted a joint letter to the Kansas Department of Health and Environment that requested the agency not to issue an air permit for the proposed new coal units, each with a nominal electric generating capacity of 700 MW. The letter requested that the three new units be required to install the best technology to minimize carbon dioxide (CO2) emissions, which are thought to contribute to global warming. Furthermore, the letter suggested the use of integrated gasification combined cycle (IGCC) technology, which conceptually would allow for less costly carbon capture.

Sunflower plans to construct the three units in Holcomb, just west of Garden City, Kansas. Two of the plants will be owned by Tri-State Generation and Transmission.
Copyright © 2019 LCG Consulting. All rights reserved. Terms and Copyright
Generator X
Generation and Transmission Planning and Optimization
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
PowerMax
Day-ahead and real-time portfolio revenue optimization
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
MarketWatch
Annual summary of prices, congestion and important events in ERCOT
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service