EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

Calpine and ExxonMobil Sign CO2 Transportation and Storage Agreement for CCS Project in Texas

LCG, April 24, 2025--Exxon Mobil Corporation (ExxonMobil) announced yesterday an agreement with Calpine Corporation (Calpine) to transport and permanently store up to 2 million metric tons per annum (MTA) of CO2 from Calpine’s Baytown Energy Center, a natural gas-fired facility located near Houston, Texas. This is part of Calpine’s Baytown Carbon Capture and Storage (CCS) Project that is designed to add CCS for the facility’s CO2 emissions. The Calpine facility could then provide a 24/7 supply of low-carbon electricity to the Texas grid plus steam to nearby industrial facilities.

Read more

Doral Renewables Selects NovaSource as Partner to Deploy the 1.6-GWdc Mammoth Solar Project in Indiana

LCG, April 21, 2025--NovaSource Power Services ("NovaSource") recently announced that it has partnered with Doral Renewables and has been selected as the Operations and Maintenance ("O&M") and Generator Operator ("GO") for the Mammoth Solar Project, one of the largest agrivoltaics facilities in the United States.

Read more

Industry News

CPUC Approves PG&E's Agreements for 585 MW of Renewable Energy

LCG, December 26, 2007--Pacific Gas and Electric Company (PG&E) announced
that the California Public Utilities Commission (CPUC) approved four renewable energy power purchase agreements (PPAs) associated with three solar and one geothermal facilities. The combined generating capacity associated with the projects is 585.5 MW.

The largest solar project is the Mojave Solar Project, with a generating capacity of 553 MW. The project will use Solel's patented solar thermal parabolic trough technology and cover about nine square miles in the Mojave Desert. The massive project will include 1.2 million mirrors that track the sun and focus the sun's energy to heat 317 miles of vacuum tubing, which will produce steam that drives electric-generating turbines. The project is scheduled to be fully operational in 2011.

Two smaller PPAs, with a combined capacity of 7 MW, associated with solar power were also approved. One PPA is with Cleantech America LLC, and the other is with GreenVolts, Inc. The projects will both utilize photovoltaic technologies and are scheduled for completion in 2009.

Lastly, the CPUC approved a PPA between PG&E and Western GeoPower, Inc. for 25.5 MW of renewable geothermal energy. The power will be generated at The Geysers Geothermal Field, which is sited approximately 75 miles north of San Francisco, California. The Geysers Geothermal Field is an existing resource that has been generating power since 1960.

California passed a Renewable Portfolio Standard (RPS) Program that requires utilities to increase their electric supply procurement of eligible renewable generating resources by one percent of load per year, with a 20 percent renewables target by the end of 2010 and a 33 percent target by the end of 2020.

According to PG&E, about 12 percent of its energy is now supplied by qualifying renewable sources under California's Renewable Portfolio Standard (RPS) program. PG&E states that it is on track to achieve the RPS target of 20 percent by 2010.
Copyright © 2025 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service