|
News
|
LCG, May 18, 2026--The U.S. Secretary of Energy today issued an emergency order to address critical grid reliability issues in the Midwest anticipated this summer. The order is in effect beginning on May 19, 2026, through August 16, 2026. The emergency order directs the Midcontinent Independent System Operator (MISO), in coordination with Consumers Energy, to ensure that the J.H. Campbell coal-fired power plant (Campbell Plant) in West Olive, Michigan shall take all steps necessary to remain available to operate and to minimize costs for the region.
Read more
|
|
LCG, May 14, 2026--The U.S. Environmental Protection Agency (EPA) announced today that it is proposing a rule to revise wastewater limits, known as effluent limitations guidelines (ELG), for steam electric power plants that will help improve grid reliability and lower electricity prices while continuing to support clean and safe water resources. If finalized, the EPA's proposal is estimated to reduce electricity generation costs by as much as $1.1 billion annually, which could provide cost-savings to American consumers.
Read more
|
|
|
Industry News
AEP to Build New West Texas Line
LCG, Sept. 22, 2000A new electric transmission line crossing part of West Texas was announced yesterday by American Electric Power Co. and the Lower Colorado River Authority, a state conservation and reclamation district that wholes power.The joint venture will build a $90 million, 345 kilovolt line that will span 150 miles across the Edward Plateau. It will be the western part of a 225 mile line that will move power from Big Spring to a point near Fort Worth, moving power from new gas-fired plants in the west to energy hungry population centers. Some new wind farms in the west will also be served.AEP will build and operate the 150-mile segment and the Lower Colorado River Authority will pay for and own it. It should be noted that the Texas Colorado River isn't the same one that flows through the Grand Canyon.The Electric Reliability Council of Texas, a regional unit of the North American Electric Reliability Council, also acts as the state's independent system operator, in charge of the Texas electric transmission grid. It has urged new lines to accommodate generation of many new merchant power plants in various parts of Texas.ERCOT has pointed to a half-dozen areas in Texas that are under-served by transmission, including the stretch to be covered by the AEP, LCRA link.More than 30 new power plants are expected to add over 18,000 megawatts of generation to the Texas system around the time the state's electricity market opens to competition in 2002, or shortly thereafter.AEP said arranging for the new line's transmission corridor is underway. Approval is needed from the Public Utility Commission of Texas before the line can be built.
|
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|
|