EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

EIA Analysis of Southwest Hydropower Generation Shows Record Lows and Slow Recovery

LCG, November 13, 2026--The U.S. Energy Information Administration (EIA) today issued an "In-Brief Analysis" highlighting the record lows for hydropower generation in the Southwest this summer. The prolonged drought conditions affecting the Colorado River Basin caused record low hydropower generation this summer in the Southwestern electricity supply region, which includes Arizona, New Mexico, and small parts of Nevada and California. Hydropower generation from April through August 2026 was a full 28 percent lower than the 10-year average and 19 percent lower than during the same period last year.

Read more

NRC Issues Construction Permit for Long Mott High-Temperature, Gas-Cooled Reactor in Texas

LCG, November 11, 2026--The Nuclear Regulatory Commission (NRC) announced on November 9 that it has approved the Construction Permit Application ("CPA") for the Long Mott Generating Station in Texas. Long Mott Energy, LLC (LME) must obtain a separate operating license from the NRC before loading fuel or operating the reactors.

Read more

Industry News

Chile says AES May Have to Buy All of Gener

LCG, Dec. 13, 2000--Chilean Securities and Insurance Superintendent Alvaro Clarke said yesterday that new legislation may require AES Corp. of the U.S. to acquire 100 percent of power producer Gener if it completes its current tender offer for 80 percent of the company.

The legislation, not yet signed by President Ricardo Lagos, requires the purchaser of two-thirds of a Chilean company to acquire the remaining equity through a tender offer. Clarke said it was very likely President Ricardo Lagos would sign the Tender Offer and Corporate Governance Bill into law before AES completes its tender offer.

"If AES Corporation takes control of two-thirds of Gener during its tender offer, and if the new law is already ratified, then it must open a new process to control 100 percent of equity at a price that is no less than the one announced," Clarke explained.

AES has said it would be willing to consider acquiring 100 percent of Gener if legislation requires the company to do so.

Gener is Chile's second-largest power producer and its largest producer of electricity from thermal power plants.

Copyright © 2026 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service