|
News
|
LCG, November 12, 2025--LCG Consulting is excited to announce the release of the MISO 2034 Data Model, built from the latest MISO Transmission Expansion Plan (MTEP). This powerful, nodal-level data model offers a forward-looking view of generation, transmission, and load forecasts across the MISO region—empowering energy professionals to explore the grid of the future with confidence.
Read more
|
|
LCG, November 12, 2025--Xcel Energy, together with the Utility Consumer Advocate (UCA), Colorado Energy Office (CEO), and Trial Staff of the Public Utilities Commission (PUC), filed a petition on November 10 requesting Commission approval to keep Comanche Generating Station Unit 2 available for up to one additional year after its currently planned retirement on December 31, 2025.
Read more
|
|
|
Industry News
Lightning Knocks Out Canadian Hydro Plant
LCG, June 6, 2001The Akolkolex Hydroelectric Plant near Revelstoke, British Columbia was struck by lightning late Monday, causing a fire in the control room. The plant shut down according to plan under its emergency systems, operators said.It was the first major property damage at the plant in more than six years of operations, according to Canadian Hydro Developers Inc. The company said it appears initially that the damage was limited to the control panels, with the generator and turbine remaining unharmed. Canadian Hydro will order new control equipment and have it installed "without delay."Ross Keating, president of Canadian Hydro, said "It is very disappointing that this damagehas occurred during the spring runoff period. We will be doing our best to be back on line as soonas possible."
|
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|
|