EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

Google and AES Sign Agreements for Co-Located Generation and Data Center in Texas

LCG, February 24, 2026--The AES Corporation (AES) and Google today announced agreements for clean power generation that will be co-located with a new Google data center in Wilbarger County, Texas. The agreements include a 20-year Power Purchase Agreements (PPA) for co-located power generation. These coordinated energy projects and powered land will enable Google to rapidly expand its operations to meet demand for core services, while AES will expand its power generation portfolio.

Read more

Amazon Announces Plans to Invest $12 Billion in Data Center Campuses in Louisiana

LCG, February 23, 2026--Amazon today announced plans to invest $12 billion to develop and construct state-of-the-art data center campuses in northwest Louisiana that will support cloud computing technologies. Amazon is partnering with STACK Infrastructure, the developer and owner of the campuses, to lead the construction and development of the data center facilities. Amazon has already invested in solar energy projects in Louisiana, bringing up to 200 MW of new carbon-free energy onto the grid.

Read more

Industry News

SDG&E Supports San Diego Transmission Link

LCG, Oct. 8, 2001--San Diego Gas & Electric Co. on Friday filed with the California Public Utilities Commission testimony strongly backing construction of its proposed $271 million, 31-mile Valley-Rainbow Interconnect transmission power-line.

The line, which could be completed by 2005, would link SDG&E's system at Rainbow and the Southern California Edison Co. system in Romoland.

"Whether or not new power plants are built in the region, the construction of the proposed project remains critical to the state's future electric reliability," SDG&E said in a statement.

"Due to the ever-changing landscape of the state's electric picture, we decided to test the need for the 500,000-volt Valley-Rainbow Interconnect by carefully exploring several different scenarios involving the need for the line," said James P. Avery, senior vice president of fuel and power operations for SDG&E.

"In each case, the common conclusion was that this project is required in 2005 and grows in importance every year thereafter. In our view, SDG&E's CPUC-mandated obligation to serve its customers with a reliable source of energy must involve the construction of this project."

Once completed, the Valley-Rainbow Interconnect could connect the state's sources of power with a pathway that can accommodate as much as 1,000 megawatts.

"Providing an enhanced electric pathway linking power sources to the north and south should help put downward pressure on electric costs by enhancing competition while bolstering reliability for all electricity users in the region," Avery said.

In the event that Southern California Edison's existing 500 kilovolt transmission system is interrupted, the Valley-Rainbow Interconnect would serve as an emergency backup for southwest Riverside County, Avery added.

Copyright © 2026 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service