|
News
|
LCG, May 6, 2026--Oklo Inc. ("Oklo"), an advanced nuclear technology company, announced today that the U.S. Nuclear Regulatory Commission (NRC) has approved the Principal Design Criteria (PDC) topical report for the Aurora-INL (Idaho National Laboratory) nuclear small modular reactor (SMR), which is currently under construction in Idaho. The PDC topical report establishes a regulatory framework that defines the fundamental safety, reliability, and performance requirements to guide future reactor licensing and design activities, and the approved report should simplify future applications and reduce the need to re-review established material.
Read more
|
|
LCG, April 30, 2026--OG&E, the operating subsidiary of OGE Energy Corp., announced today that it will power three new data centers that Google announced in Muskogee and Stillwater, Oklahoma last year. As part of the agreement, Google will also make power generation capacity available from two solar facilities in Stephens and Muskogee Counties that are currently under construction. The data centers and associated Electric Service Agreements are expected to provide economic growth for local communities and the state, contribute to grid stability, and benefit OG&E's current customers.
Read more
|
|
|
Industry News
Utilities, Industrials to Invest $2 Billion in Brazil Power
LCG, Dec. 3, 2001--Electricit de France and Tractebel of Belgium, as well as aluminum producers Alcoa and Billiton Metals, said on Friday during the auction of 11 hydroelectric plants, that they would invest about $2 billion in Brazil's power sector.The companies would add 2,700 megawatts of installed capacity to Brazilian generation resources over the next six years, they said. New power plants would be built in 10 states between 2003 and 2007.The plan would do little to alleviate the current power shortage in Brazil, but was seen as a vote of confidence in the Brazilian economy. Jose Maria Abdo, head of Brazil's regulatory agency Agencia Nacional de Energia Eletrica (Aneel), said "This is a reflection of investors' confidence in spite of the period of economic instability."
|
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|
|