News
LCG, September 3, 2025--The Tennessee Valley Authority (TVA) and ENTRA1 Energy (ENTRA1) yesterday announced a new agreement to advance nuclear power development within TVA’s service region. Under the agreement, ENTRA1 Energy will collaborate with TVA to deploy six ENTRA1 Energy Plants™, each powered by multiple NuScale Power Modules™, to provide up to 6 GW of firm, 24/7 baseload power.
Read more
|
LCG, August 27, 2025--Wärtsilä Energy announced yesterday an agreement with East Kentucky Power Cooperative (EKPC) to supply the engineering and equipment for a 217-MW power plant to be constructed in Liberty, Kentucky. The Wärtsilä equipment is scheduled for delivery in mid-2027, and the plant is expected to be commissioned in early 2028.
Read more
|
|
|
Industry News
Reliant Plant in Florida To Begin Operations
LCG, Jan. 16, 2002--A gas- and oil-fired generating facility in Florida, the Osceola Peaking Plant, is undergoing testing before it begins to sell its output.Reliant Resources, Incorporated, a subsidiary of Reliant Energy, recently merged with Orion Power, resulting in a combined capacity of 21,000 megawatts, when the 465-megawatt Osceola plant is included.Two-thirds of the plant's generation is under contract to the rural electric cooperative, Seminole Electric Cooperative Inc., while the rest is to be sold to the grid. The facility, near Holopaw, Fla., consists of three 155-megawatt combustion turbines.
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|