|
News
|
LCG, November 12, 2025--LCG Consulting is excited to announce the release of the MISO 2034 Data Model, built from the latest MISO Transmission Expansion Plan (MTEP). This powerful, nodal-level data model offers a forward-looking view of generation, transmission, and load forecasts across the MISO region—empowering energy professionals to explore the grid of the future with confidence.
Read more
|
|
LCG, November 12, 2025--Xcel Energy, together with the Utility Consumer Advocate (UCA), Colorado Energy Office (CEO), and Trial Staff of the Public Utilities Commission (PUC), filed a petition on November 10 requesting Commission approval to keep Comanche Generating Station Unit 2 available for up to one additional year after its currently planned retirement on December 31, 2025.
Read more
|
|
|
Industry News
Largest Wind Farm to be Built in Washington State
LCG, March 15, 2002-Energy Northwest announced plans to build the largest American wind farm to supply public power in the Northwest.37 turbines will comprise the 48 megawatt, $70 million endeavor. Turbines, mounted on 195 foot towers, will occupy 5,000 acres south of Kennewick, Washington. Power will be generated at wind speeds reaching 7 mph or more, although maximum capacity will be reached at 35 mph.Eight Public Utility Districts of nearby counties have invested in the project: Okanogan, Benton, Chelan, Douglas, Grant, Grays Harbor, Lewis, and Mason counties. The turbines should be constructed and running by August.
|
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|
|