News
LCG, September 16, 2025--Southwest Power Pool’s (SPP) Board of Directors today announced that the Board approved a process to facilitate the connection of large users of electricity to the power grid while continuing to support energy needs for the entire region. SPP's new process is designed to incorporate transmission service, generation, load interconnection and other relevant reliability studies into a single framework that enables timely, informed decision-making and action.
Read more
|
LCG, September 15, 2025--Longroad Energy announced today the financial close of 1000 Mile Solar, its 300 MWac (400 MWdc) solar project in Yoakum County, Texas. Longroad Energy finalized a long-term offtake agreement with Meta late last year in the form of an Environmental Attributes Purchase Agreement, which includes a financial settlement arrangement for the entire energy output of 1000 Mile Solar.
Read more
|
|
|
Industry News
Largest Wind Farm to be Built in Washington State
LCG, March 15, 2002-Energy Northwest announced plans to build the largest American wind farm to supply public power in the Northwest.37 turbines will comprise the 48 megawatt, $70 million endeavor. Turbines, mounted on 195 foot towers, will occupy 5,000 acres south of Kennewick, Washington. Power will be generated at wind speeds reaching 7 mph or more, although maximum capacity will be reached at 35 mph.Eight Public Utility Districts of nearby counties have invested in the project: Okanogan, Benton, Chelan, Douglas, Grant, Grays Harbor, Lewis, and Mason counties. The turbines should be constructed and running by August.
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|