|
News
|
LCG, October 23, 2025--Google announced today a first-of-its kind agreement to support a natural gas-fired power plant with carbon capture and storage (CCS). The 400-MW Broadwing Energy power project, located in Decatur, Illinois, will capture and permanently store its carbon dioxide (CO2) emissions. By agreeing to buy most of the power it generates, Google is helping get this new, baseload power source built and connected to the regional grid that supports our data centers.
Read more
|
|
LCG, October 21, 2025--The U.S. Environmental Protection Agency (EPA) today issued three final Underground Injection Control (UIC) Class VI permits to ExxonMobil for their Rose Carbon Capture and Storage (CCS) Project located in Jefferson County, Texas. Under the Safe Drinking Water Act, these permits allow ExxonMobil to convert three existing test wells permitted by the state to carbon dioxide (CO2) storage injection wells for long-term storage.
Read more
|
|
|
Industry News
Largest Wind Farm to be Built in Washington State
LCG, March 15, 2002-Energy Northwest announced plans to build the largest American wind farm to supply public power in the Northwest.37 turbines will comprise the 48 megawatt, $70 million endeavor. Turbines, mounted on 195 foot towers, will occupy 5,000 acres south of Kennewick, Washington. Power will be generated at wind speeds reaching 7 mph or more, although maximum capacity will be reached at 35 mph.Eight Public Utility Districts of nearby counties have invested in the project: Okanogan, Benton, Chelan, Douglas, Grant, Grays Harbor, Lewis, and Mason counties. The turbines should be constructed and running by August.
|
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|
|