EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

MISO Long-Term Nodal Insights

LCG, November 12, 2025--LCG Consulting is excited to announce the release of the MISO 2034 Data Model, built from the latest MISO Transmission Expansion Plan (MTEP). This powerful, nodal-level data model offers a forward-looking view of generation, transmission, and load forecasts across the MISO region—empowering energy professionals to explore the grid of the future with confidence.

Read more

Xcel Energy and "Allies" Request Retirement Extension for Comanche Generating Station Unit 2

LCG, November 12, 2025--Xcel Energy, together with the Utility Consumer Advocate (UCA), Colorado Energy Office (CEO), and Trial Staff of the Public Utilities Commission (PUC), filed a petition on November 10 requesting Commission approval to keep Comanche Generating Station Unit 2 available for up to one additional year after its currently planned retirement on December 31, 2025.

Read more

Industry News

Gas Pipeline Connects Russia and Turkey

LCG, June 4, 2002--The $2.3 billion Blue Stream project, a gas pipeline from Russia to Turkey, has been completed and is ready for testing.

Eni SpA, an Italian oil and gas company, installed the pipeline in the Russian part of the Black Sea and says that the testing for both of the two lines created in the project will be completed by the end of the year.

The pipeline will annually move 16 billion cubic meters of gas from Russia to Turkey. The 24-inch diameter pipelines span 239 miles (384 kilometers) and are at an underwater depth of up to 2,150 meters.

Copyright © 2025 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service