|
News
|
LCG, May 19, 2026--Avangrid, Inc., a member of the Iberdrola Group, today announced the signing of a long-term Power Purchase Agreement (PPA) with Puget Sound Energy (PSE) for the 199.5-MW Big Horn I wind project in Klickitat County, Washington. This agreement represents the fourth PPA executed by the two companies for projects in the Pacific Northwest.
Read more
|
|
LCG, May 18, 2026--The U.S. Secretary of Energy today issued an emergency order to address critical grid reliability issues in the Midwest anticipated this summer. The order is in effect beginning on May 19, 2026, through August 16, 2026. The emergency order directs the Midcontinent Independent System Operator (MISO), in coordination with Consumers Energy, to ensure that the J.H. Campbell coal-fired power plant (Campbell Plant) in West Olive, Michigan shall take all steps necessary to remain available to operate and to minimize costs for the region.
Read more
|
|
|
Industry News
830 MW Texas Combined-Cycle in Operation
LCG, June 5, 2002--Calpine Corporation, based in San Jose, California, announced that its 830 MW Baytown Energy Center has entered into combined-cycle operations.The Texas facility, located in Baytown, generates 700 MW under base load and can provide 130 MW additional capacity when demand increases.The company says its plant results in 96 percent less nitrogen oxide emission, 99 percent less sulfur dioxide emission, and half as much carbon dioxide emission than the Texas average for power plants.Calpine has a twenty-year contract with chemical company Bayer to provide electricity and steam from the Baytown plant.
|
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|
|