News
LCG, May 8, 2025--The Southwest Power Pool (SPP) Board of Directors approved SPP’s proposed Expedited Resource Adequacy Study (ERAS) at its May 6 meeting. SPP developed the new ERAS in collaboration with its stakeholders in response to the growing need to add new generating resources before the region’s generating capacity is outpaced by its electricity demands. ERAS is intended to be a one-time, expedited study process designed to significantly accelerate the addition of new power generation facilities to the grid and address concerns about the near term ability to maintain the affordable and reliable electric service that consumers expect.
Read more
|
LCG, May 7, 2025--EDP Renewables North America LLC (EDPR NA) announced yesterday the inauguration of its Scarlet II Solar Energy Park (Scarlet II) in Fresno County, California. This phase of the solar plus energy storage project includes 200 MW of solar capacity, plus a co-located 150 MW/600 MWh battery energy storage system (BESS). The initial phase of the project, Scarlet I, which provides 200 MW of solar and 40 MW/160 MWh of BESS, achieved commercial operations in July 2024.
Read more
|
|
|
Industry News
Olive Power in Operation
LCG, June 11, 2002--Spain's first olive biomass plant is in operation near Villarta de San Juan in Ciudad Real.Endesa SA, which owns Endesa Cogeneracion y Renovables, announced that a 16 MW plant is producing electricity from olive parts left over after oil has been extracted.Energias de la Mancha (Enemans), Agencia de la Energia de Castilla La Mancha (the local energy company), and Aceites Pina SA own 52 percent, 24 percent, and 24 percent stakes respectively.
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|