|
News
|
LCG, November 12, 2025--LCG Consulting is excited to announce the release of the MISO 2034 Data Model, built from the latest MISO Transmission Expansion Plan (MTEP). This powerful, nodal-level data model offers a forward-looking view of generation, transmission, and load forecasts across the MISO region—empowering energy professionals to explore the grid of the future with confidence.
Read more
|
|
LCG, November 12, 2025--Xcel Energy, together with the Utility Consumer Advocate (UCA), Colorado Energy Office (CEO), and Trial Staff of the Public Utilities Commission (PUC), filed a petition on November 10 requesting Commission approval to keep Comanche Generating Station Unit 2 available for up to one additional year after its currently planned retirement on December 31, 2025.
Read more
|
|
|
Industry News
ISO New England Allows NRG Plant Shutdown
LCG, August 12, 2002-On Friday, the New England Independent System Operator allowed NRG to take its Devon plant off line.The plant's shutdown had been discussed for several months. NRG wanted to shut it down because the operating costs were too high relative to electricity prices. ISO New England was cautious about allowing the shutdown since the plant supplies southwest Connecticut, which already has limited energy reserves.NRG will be allowed to shut off Devon's unit 10 after October 1 but must continue operating units 7 and 8, which offer 107 megawatts of capacity, until October 2003 or until the ISO deems necessary. Unit 10 provides only 17 MW.The amount by which NRG will be compensated has not been released.NRG is a unit of Xcel Energy Group Inc.
|
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|
|