|
News
|
LCG, May 7, 2026--PJM issued today its Summer Outlook 2026, which forecasts sufficient generation for typical peak demand this summer. PJM states that it is prepared to call on contracted demand response resources to reduce electricity use during times of high system stress.
Read more
|
|
LCG, May 6, 2026--Oklo Inc. ("Oklo"), an advanced nuclear technology company, announced today that the U.S. Nuclear Regulatory Commission (NRC) has approved the Principal Design Criteria (PDC) topical report for the Aurora-INL (Idaho National Laboratory) nuclear small modular reactor (SMR), which is currently under construction in Idaho. The PDC topical report establishes a regulatory framework that defines the fundamental safety, reliability, and performance requirements to guide future reactor licensing and design activities, and the approved report should simplify future applications and reduce the need to re-review established material.
Read more
|
|
|
Industry News
Southeastern Grid Plan Gains Momentum
LCG, Oct. 11, 2002--An outline for a regional transmission organization (RTO) that would serve an area extending from South Carolina to Louisiana and central features concerning its management were approved by a 4-0 vote by the Federal Energy Regulatory Commission (FERC), allowing its supporters to develop a full, detailed proposal for an entity known as SeTrans.The design of SeTrans has been developed thus far by Southern Co., which has a significant transmission presence in the Southeast, Entergy Corp., based in New Orleans, and by nine municipal and public providers of power. The states seen as having at least part of their transmission grid overseen through SeTrans also include Georgia, Florida, Alabama, Mississippi, Arkansas, and Texas.The approval of the outline raises the likelihood that the formal proposal will be substantially accepted by FERC as conforming with its proposed rules concerning grid reliability, tariff design, and an independent grid administrator.
|
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|
|