EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

OPG Completes Darlington Nuclear Station Refurbishment Project Under Budget and Ahead of Schedule

LCG, February 2, 2026--Ontario Power Generation (OPG) announced today that construction on the four-unit Darlington Refurbishment project is now complete. Station staff are completing final testing, and the last unit is expected to return to service in the coming weeks. OPG stated that the overall project is currently four months ahead of schedule and $150 million under budget.

Read more

NERC's New Annual Assessment Shows Rapid Demand Growth Increasing Resource Adequacy Risks Across North America

LCG, January 30, 2026--The North American Electric Reliability Corporation (NERC) yesterday issued its 2025 Long-Term Reliability Assessment (LTRA) and infographic that spotlight intensifying resource adequacy risks throughout the North American bulk power system (BPS) over the next 10 years.

Read more

Industry News

GE Introduces Most Efficient Turbine to Date

LCG, Dec. 10, 2003--A gas turbine that would surpass all existing simple-cycle turbines in efficiency was formally introduced today by GE at the Power-Gen International conference in Las Vegas.

The LMS100 is a 100-megawatt turbine that will undergo development testing in May 2004, and is aimed at the peak and mid-range markets. It is novel, GE announced, in that it achieves efficiency of 46 percent by including components from GE Power Systems' heavy-duty frame gas turbines and GE Aircraft Engines' aeroderivative gas turbines.

"This program is a first for GE in that not only are multiple businesses providing development expertise, but they are also designing, manufacturing, sourcing, assembling and testing the product," the president and CEO of GE Aircraft Engines, David Calhoun, said.

Although the LMS100 is a simple-cycle turbine, it claims efficiency of 40% at 50% of its capacity, indicating better efficiency than some turbines realize at full output.
Copyright © 2026 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service