EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

Avangrid and Puget Sound Energy Sign PPA, Including Upgrade and Life Extension, for Washington Wind Project

LCG, May 19, 2026--Avangrid, Inc., a member of the Iberdrola Group, today announced the signing of a long-term Power Purchase Agreement (PPA) with Puget Sound Energy (PSE) for the 199.5-MW Big Horn I wind project in Klickitat County, Washington. This agreement represents the fourth PPA executed by the two companies for projects in the Pacific Northwest.

Read more

DOE Acts to Ensure Key Coal-fired Power Plants Are Available in MISO to Supply Peak Summer Demands

LCG, May 18, 2026--The U.S. Secretary of Energy today issued an emergency order to address critical grid reliability issues in the Midwest anticipated this summer. The order is in effect beginning on May 19, 2026, through August 16, 2026. The emergency order directs the Midcontinent Independent System Operator (MISO), in coordination with Consumers Energy, to ensure that the J.H. Campbell coal-fired power plant (Campbell Plant) in West Olive, Michigan shall take all steps necessary to remain available to operate and to minimize costs for the region.

Read more

Industry News

FERC to Require Reporting When Reliability Standards Not Met

LCG, Dec. 17, 2003--The Federal Energy Regulatory Commission (FERC) intends to require that utilities report instances in which they fail to meet voluntary standards set by the North American Electric Reliability Council.

The Chairman of FERC, Pat Wood III, said that as long as the scope of FERC's authority to enforce standards remains in doubt because of the stalled energy legislation in Congress, requiring reporting would be a first step before NERC's voluntary standards could become legally binding. The reporting requirement could become effective before summer, Wood told the agency.

In addition to the reporting requirement, for which support has been expressed by other commissioners as an initial step in improving reliability, FERC might undertake audits of utility performance. The audits could be used to verify compliance by individual utilities.
Copyright © 2026 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service