|
News
|
LCG, December 8, 2025--Basin Electric Power Cooperative (Basin Electric) and NextEra Energy Resources, LLC (NextEra) today announced that they have signed a memorandum of understanding (MOU) to explore the joint development of the River Run Energy Center, a new combined-cycle natural gas-fueled generation facility in Basin Electric's North Dakota service territory. The proposed facility will have a planned capacity of approximately 1,450 MW.
Read more
|
|
LCG, December 2, 2025 — LCG today announced the release of its PJM Congestion Outlook for January–March 2026, delivering a fundamentals-based, three-month forecast designed to help traders and risk managers better navigate congestion risks in PJM’s FTR markets.
Read more
|
|
|
Industry News
600-MW CC Starts Operation in Wisconsin
LCG, June 10, 2004--A dual fuel combined-cycle plant built by Calpine Corp. in Beloit, Wisc., began operating on June 1 last week, with a capacity of 600 megawatts.Most of the capacity of the Riverside Energy Center is under contract to Alliant Energy and Madison Gas & Electric Company, in amounts of 453 and 75 megawatts, respectively. Calpine owns two other power plants that serve Wisconsin customers, with its 450-megawatt Zion Energy Center and 460-megawatt Rockgen Energy Center. Another facility, the Fox Energy Center, is under construction in the town of Kaukauna.
|
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|
|