|
News
|
LCG, November 12, 2025--LCG Consulting is excited to announce the release of the MISO 2034 Data Model, built from the latest MISO Transmission Expansion Plan (MTEP). This powerful, nodal-level data model offers a forward-looking view of generation, transmission, and load forecasts across the MISO region—empowering energy professionals to explore the grid of the future with confidence.
Read more
|
|
LCG, November 12, 2025--Xcel Energy, together with the Utility Consumer Advocate (UCA), Colorado Energy Office (CEO), and Trial Staff of the Public Utilities Commission (PUC), filed a petition on November 10 requesting Commission approval to keep Comanche Generating Station Unit 2 available for up to one additional year after its currently planned retirement on December 31, 2025.
Read more
|
|
|
Industry News
Sacramento MUD's Wind Installation Upgraded
LCG, June 11, 2004--A wind installation in Rio Vista, California, which supplies the Sacramento Municipal Utility District, has an additional seven turbines supplying 5 megawatts.The greatest level of output is expected to be obtained during the period of May through September, which is also the time during which seasonal demand is highest. SMUD has increased the number of turbines at the facility in Solano County a few times since its original installation in 1994.Dace Udris, the spokesperson for the utility, told the Sacramento Bee that the current level of renewable generation as compared with its overall output is 5.5 per cent. The utility is planning an increase in the portion of renewables such that by 2006, it will have attained 10 per cent renewable generation, and by 2011, 20 per cent.
|
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|
|