EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

RWE and Meta Announced New PPA for 200-MW Waterloo Solar Project

LCG, March 18, 2025--RWE and Meta today announced a new power purchase agreement (PPA) for offtake from RWE's 200-MW Waterloo Solar Project, which is located in Bastrop County, Texas. Under the agreement, Meta will purchase 100% of the output from the solar facility, which will support Meta's goal of matching its electricity needs with 100 percent clean energy. The project is scheduled to commence onsite construction in late 2025.

Read more

CPUC Approves SDG&E's Westside Canal Battery Energy Storage Expansion Project

LCG, March 14, 2025--The California Public Utilities Commission (CPUC) approved an expansion of San Diego Gas & Electric's (SDG&E) Westside Canal Battery Energy Storage facility. The expansion project is located in California's Imperial Valley and will add 100 MW of energy storage capacity to the existing 131 MW facility. The new capacity is expected to be fully operational by June 2025. Upon completion, the Westside Canal facility, with a total capacity of 231 MW, will be the largest storage asset in SDG&E's utility-owned battery storage portfolio.

Read more

Industry News

Reliant Dedicates Seward Coal Plant

LCG, October 1, 2004--Yesterday Reliant Energy dedicated its new, 521-MW Seward Power Plant, which uses low-grade refuse from coal mines for fuel. The plant is located 80 miles east of Pittsburgh at the site of an 82-year old coal-fired power plant that Reliant retired last year. The plant is currently being tested and is expected to commence commercial operations shortly.

By burning refuse coal, the technologically advanced plant will provide for the clean-up of numerous waste-coal piles in the region. The Commonwealth of Pennsylvania, through one of its agencies, provided tax-exempt financing for the project.

The Seward Power Plant is one solid, positive sign of the emergence of new, coal-fired stations. A common theme is adding capacity at existing coal stations, where much of the related infrastructure is in place and the incremental expansion is less dramatic to local neighbors. Recently, the Public Service Commission of Wisconsin (PSCW) approved a new, 500 MW coal-fired unit proposed by Wisconsin Public Service Corp. at its Weston Power Plant near Wausau. The expansion at Weston, where there are three coal units currently operating, is the first project approved by the PSCW under a new law designed to simplify and streamline the approval process. Late last year, the PSCW approved the construction of We Energies' Oak Creek Project, which adds two, 615-MW, supercritical pulverized coal units at an existing coal station.

With respect to being the fuel supply of choice for new power plants, coal still has an image problem to overcome. In August, citizens in Springfield, Missouri voted down a proposal by City Utilities of Springfield to build a 300 MW, coal-fired power plant, and the mayor of Los Angeles instructed the Los Angeles Department of Water and Power to withdraw from the expansion of the coal-fired, Intermountain Power Plant in Utah and to instead pursue cleaner, renewable energy sources.

Copyright © 2025 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service