EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

U.S. Coal-fired Generating Capacity Retirements in 2025 Are Less Than 20 Percent of Retirements in 2022

LCG, April 13, 2026--The EIA today released an "In-brief Analysis" of U.S. coal-fired generating capacity retirements in 2025. A highlight of the analysis is that, during 2025, the electric power sector retired 2.6 GW of coal-fired generating capacity at four power plants, which is (i) the least since 2010 and (ii) 5.9 GW less than the planned retirement of 8.5 GW at the beginning of 2025.

Read more

EPA Proposes Rule Changes to Coal Combustion Residuals (CCR) Requirements to Restore American Energy Dominance

LCG, April 10, 2026--The U.S. Environmental Protection Agency (EPA) announced yesterday a rule proposing several revisions to the federal regulations governing the disposal of coal combustion residuals (CCR) and the beneficial use of CCR. The EPA designed the rule to encourage resource recovery, allow for site-specific considerations in permitting, and provide regulatory relief while continuing to protect human health and the environment. The EPA will be accepting comments on the rule for 60 days after publication in the Federal Register, and it will also hold an online public hearing on the rule.

Read more

Industry News

IPL Receives Favorable Decision from IUB for Wind Farm Development

LCG, February 8, 2008--The Iowa Utilities Board (IUB) yesterday issued a decision approving a return on equity of 11.7 percent for up to 200 MW of wind development in Iowa planned by Interstate Power and Light Company (IPL), a subsidiary of Alliant Energy Corporation.

IPL plans to commence building the Whispering Willow Wind Farm in Franklin County, Iowa next year, with construction scheduled for completion in 2010. The electric generating capacity of the project is 200 MW, and the estimated project cost is $400 million to $450 million. The project will be IPL's first, company-owned wind farm. IPL has the ability to develop an additional 300 MW of wind power at an adjacent site given an acquisition from Iowa Winds, LLC. earlier this month.

IPL filed an application in September 2007 with the IUB concerning the proposed wind farms in Iowa. IPL requested approval that the proposed ratemaking principles were reasonable prior to committing to the project.

The IUB's decision approved the terms of a settlement agreement between IPL and the Iowa Office of Consumer Advocate that includes a return on equity of 11.7 percent and a 25 year depreciation life for up to 200 MW of wind capacity developed in Iowa by IPL.

Copyright © 2026 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service