News
LCG, May 15, 2025--The Federal Energy Regulatory Commission (FERC) announced today the release of the staff’s 2025 Summer Assessment on the outlook for energy markets and electric reliability during the June to September time frame.
Read more
|
LCG, May 14, 2025--The U.S. Nuclear Regulatory Commission (NRC) accepted Dow's construction permit application to build X-energy Reactor Company, LLC's ("X-energy") first small modular reactor (SMR) plant to power a chemical facility in Seadrift, Texas. Dow's wholly-owned subsidiary, Long Mott Energy LLC, is developing the project to provide Dow's UCC1 Seadrift Operations manufacturing site with safe, reliable, and clean power and industrial steam to replace existing energy and steam assets that are approaching end-of-life. The project is part of a demonstration project supported by the U.S. Department of Energy (DOE) and, if approved, would be the first advanced nuclear facility at an industrial site in the United States.
Read more
|
|
|
Industry News
ACCIONA Windpower Introduces 3 MW Wind Turbine
LCG, June 5, 2008--ACCIONA Windpower this week introduced its 3-MW wind turbine at the American Wind Energy Association's (AWEA) Windpower 2008 Conference and Exhibition in Houston, Texas. ACCIONA states that deliveries of the AW-3000 wind turbine are expected in the second half of 2010.
ACCIONA developed the AW-3000 based on extensive experience with the existing AW-1500. The new, 3.0-MW wind turbine is designed to operate in three wind classes: IEC Ia, IEC IIa and IEC IIIa. The AW-3000 is designed to operate at variable speed with an independent pitch system for each blade.
The dimensions of the AW-3000 are impressive. Three rotor diameter options are available: 100, 109 and 116 meters. The turbine is supplied with a concrete tower that provides a hub height of either 100 or 120 meters - both of which are taller than the Statue of Liberty - including her base.
ACCIONA Windpower manufactures wind turbines at four factories, with two located in Spain and one each in the United States, and China. The plant located in West Branch, Iowa will produce both the AW-3000 and the AW-1500 wind turbines.
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|