EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

DTE Energy Invests in 1.5 GW of Michigan-made Battery Energy Storage Systems for Eight Projects

LCG, May 28, 2026--DTE Energy yesterday announced a $1.6 billion investment to develop Michigan-made battery energy storage systems across Michigan through partnering with LG Energy Solution Vertech, the U.S. energy storage division of LG Energy Solution.

Read more

Microsoft and Avangrid Sign PPA for Bluebird Solar Project in Washington State

LCG, May 27, 2026--Avangrid, Inc., a member of the Iberdrola Group, today announced the signing of a Power Purchase Agreement (PPA) with Microsoft for the 140 MWdc (100 MWac) Bluebird Solar project in Klickitat County, Washington. Bluebird is located near four other energy projects owned and operated by Avangrid in Klickitat County and represents another $300 million investment in the community. The Bluebird Solar project is expected to achieve commercial operation in 2028.

Read more

Industry News

PG&E Announces Agreements for Colossal New Solar Farms

LCG, August 15, 2008--Pacific Gas and Electric Company (PG&E) yesterday announced that it has executed two contracts for solar electricity generation totaling 800 MW of photovoltaic (PV) capacity. Construction of both solar farms is scheduled to begin in 2010.

One agreement is with Topaz Solar Farms LLC, a subsidiary of OptiSolar Inc. The 550-MW project will use thin-film, PV panels designed and manufactured by OptiSolar in California. The solar farm will be constructed in San Luis Obispo County, California and will have a footprint covering nearly 6,100 acres. The project is scheduled to start providing power to the grid in 2011 and be fully operational by 2013.

PG&E's second power purchase agreement is with High Plains Ranch II, LLC, a subsidiary of SunPower Corporation. The High Plains Ranch II project will have a design capacity of 250 MW and will be built in San Luis Obispo County, California. The project will use SunPower's proprietary crystalline PV solar cells, together with its patented SunPower Tracker solar tracking system, to improve energy capture. High Plains Ranch II is scheduled to commence delivering electricity to the grid in 2010 and be fully operational in 2012.

California passed a Renewable Portfolio Standard (RPS) Program that requires utilities to increase their electric supply procurement of eligible renewable generating resources by one percent of load per year, with a 20 percent renewables target by the end of 2010 and a 33 percent target by the end of 2020.

On the other side of the country, last month the Florida Public Service Commission approved two solar PV projects proposed by Florida Power & Light Company (FPL). The projects include what was touted as the world's largest PV solar system. The two solar PV facilities will have a combined electric generating capacity of 35 MW. SunPower Corporation was selected by FPL to design and build the facilities that will incorporate SunPower PV panels.

In DeSoto County, Florida, a 25-MW solar PV facility will be built that includes the installation of the SunPower Tracker system that follows the sun to increase electric generation from the panels. A 10-MW project will be constructed at the Kennedy Space Center. The DeSoto project is scheduled to commence operations by December 2009, and the Kennedy Space Center is scheduled to commence operations by the first quarter of 2010.

Both Florida projects will be owned, operated and maintained by FPL. SunEdison will develop, finance, build, operate, monitor and maintain the solar farms.
Copyright © 2026 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service