|
News
|
LCG, May 28, 2026--DTE Energy yesterday announced a $1.6 billion investment to develop Michigan-made battery energy storage systems across Michigan through partnering with LG Energy Solution Vertech, the U.S. energy storage division of LG Energy Solution.
Read more
|
|
LCG, May 27, 2026--Avangrid, Inc., a member of the Iberdrola Group, today announced the signing of a Power Purchase Agreement (PPA) with Microsoft for the 140 MWdc (100 MWac) Bluebird Solar project in Klickitat County, Washington. Bluebird is located near four other energy projects owned and operated by Avangrid in Klickitat County and represents another $300 million investment in the community. The Bluebird Solar project is expected to achieve commercial operation in 2028.
Read more
|
|
|
Industry News
Georgia EPD Issues Draft Permits for Proposed Coal-fired Power Plant in Georgia
LCG, August 26, 2009--POWER4Georgians, a coalition of Georgia electric membership cooperatives (EMCs), announced yesterday that the Georgia Environmental Protection Division (EPD) issued draft permits for their proposed coal-fired, power plant in Georgia. The Georgia EPD issued drafts of the air permit, the surface water withdrawal permit, the groundwater withdrawal permit, and the water discharge permit.
The proposed power station, Plant Washington, would be an 850-MW, electric generating station located on a 1,600-acre site in Washington County, Georgia. The project incorporates supercritical technology to improve efficiency and better enable reduced emissions.
|
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|
|