EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

EIA Analysis of Southwest Hydropower Generation Shows Record Lows and Slow Recovery

LCG, November 13, 2026--The U.S. Energy Information Administration (EIA) today issued an "In-Brief Analysis" highlighting the record lows for hydropower generation in the Southwest this summer. The prolonged drought conditions affecting the Colorado River Basin caused record low hydropower generation this summer in the Southwestern electricity supply region, which includes Arizona, New Mexico, and small parts of Nevada and California. Hydropower generation from April through August 2026 was a full 28 percent lower than the 10-year average and 19 percent lower than during the same period last year.

Read more

NRC Issues Construction Permit for Long Mott High-Temperature, Gas-Cooled Reactor in Texas

LCG, November 11, 2026--The Nuclear Regulatory Commission (NRC) announced on November 9 that it has approved the Construction Permit Application ("CPA") for the Long Mott Generating Station in Texas. Long Mott Energy, LLC (LME) must obtain a separate operating license from the NRC before loading fuel or operating the reactors.

Read more

Industry News

Southern Power Breaks Ground at Biomass Project in Texas

LCG, November 11, 2009--Southern Power yesterday held the groundbreaking ceremony for its Nacogdoches Generating Facility located in Sacul, Texas. The 100-MW power plant will be fueled with biomass, and commercial operation is scheduled to begin in the summer of 2012.

Southern Power, a subsidiary of Southern Company, acquired the project last month from American Renewables, LLC. Electricity generated from the power plant is committed through a 20-year, power purchase agreement (PPA) with Austin Energy, the municipal utility of Austin, Texas. Austin Energy has a 30-percent renewable energy goal by the year 2020.

The President of Southern Power stated, "This is an exciting time for Southern Power as we expand our presence in the wholesale market and diversify our fuel mix with a renewable resource....Southern Power has a reputation of helping its customers meet their energy needs in cost-effective, reliable and environmentally responsible manner and we're pleased to be a partner with Austin Energy on a project that supports their environmental goals."

When completed, the facility will burn forest residues, wood processing residues and clean municipal wood waste in a fluidized boiler to generate steam that will drive a steam turbine to generate electricity. The annual fuel required will be approximately one million tons, which is expected to be transported to the plant from within a 75-mile radius of the project site.

The construction period for the Nacogdoches facility is estimated to be approximately 32 months, and the total estimated cost of the project is between $475 million and $500 million.

The acquisition of Nacogdoches Power, LLC is a new venture for Southern Power into biomass fuels, as well as into the State of Texas. Southern Power currently owns and operates more than 7,700 MW of natural gas-fueled generation assets in Alabama, Georgia, Florida, and North Carolina.
Copyright © 2026 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service