EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

EIA Analysis of Southwest Hydropower Generation Shows Record Lows and Slow Recovery

LCG, November 13, 2026--The U.S. Energy Information Administration (EIA) today issued an "In-Brief Analysis" highlighting the record lows for hydropower generation in the Southwest this summer. The prolonged drought conditions affecting the Colorado River Basin caused record low hydropower generation this summer in the Southwestern electricity supply region, which includes Arizona, New Mexico, and small parts of Nevada and California. Hydropower generation from April through August 2026 was a full 28 percent lower than the 10-year average and 19 percent lower than during the same period last year.

Read more

NRC Issues Construction Permit for Long Mott High-Temperature, Gas-Cooled Reactor in Texas

LCG, November 11, 2026--The Nuclear Regulatory Commission (NRC) announced on November 9 that it has approved the Construction Permit Application ("CPA") for the Long Mott Generating Station in Texas. Long Mott Energy, LLC (LME) must obtain a separate operating license from the NRC before loading fuel or operating the reactors.

Read more

Industry News

Sempra Acquires 78-MW Wind Project in Minnesota

LCG, April 24, 2015-Sempra U.S. Gas & Power yesterday announced that it has acquired the Black Oak Getty wind project in Sterns County, Minnesota from Geronimo Energy, LLC, a wind and solar energy developer. Construction is scheduled to begin in spring 2016, and the project is expected be in commercial operation late next year.

Minnesota Municipal Power Agency (MMPA) will purchase all of the power generated from the wind farm under a 20-year power purchase agreement (PPA). The purchase will help MMPA meet its renewable energy obligation of 25 percent in 2025.

The president and CEO of Sempra U.S. Gas & Power stated, "We are pleased to have the opportunity to diversify and expand our renewables portfolio through the acquisition, development and operation of the Black Oak Getty wind project. We look forward to providing Minnesota with a stable supply of clean, renewable energy and becoming a long-term partner with the local community through the development and operation of this project."

The Black Oak Getty wind farm is located in central Minnesota. The project is expected to include up to 51 wind turbines.

Once the 78-MW Black Oak Getty project is completed, Sempra U.S. Gas & Power, together with its affiliates and joint-venture partners, will have wind facilities in seven states with a combined generating capacity in excess of 1,200 MW.
Copyright © 2026 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service