|
News
|
LCG, November 19, 2025--Oklo Inc. and Siemens Energy announced today that the parties have signed a binding contract for the design and delivery of the power conversion system for Oklo’s Aurora-INL (Idaho National Laboratory) nuclear small modular reactor (SMR). The agreement authorizes Siemens Energy to begin engineering and design work to expedite procurement of long-lead components and to initiate the manufacturing process for the power conversion system. Oklo’s expertise in advanced fission technology will be combined with Siemens Energy’s extensive industry experience with steam turbine and generator systems, with the ultimate goal of generating carbon-free, reliable electricity.
Read more
|
|
LCG, November 19, 2025--NERC yesterday released its 2025–2026 Winter Reliability Assessment (WRA), which concludes "much of North America is again at an elevated risk of having insufficient energy supplies to meet demand in extreme operating conditions." The WRA does state that resources are adequate for normal winter peak demand, but extended, wide-area cold snaps will be challenging.
Read more
|
|
|
Industry News
DONG Energy Announces Opening of the Burbo Bank Extension Project with 8-MW Offshore Wind Turbines
LCG, May 23, 2017--The Burbo Bank Extension Project, a new offshore wind farm in Liverpool Bay, UK, opened on May 17 and became the first offshore wind farm to make commercial use of the MHI Vestas V164-8.0 MW wind turbines. The wind farm is a joint venture between DONG Energy (50%) and its partners PKA (25%) and KIRKBI A/S, parent company of the LEGO Group (25%).
The 8-MW wind turbines are massive, measuring 195 meters from sea level to blade tip. Each blade weighs 35 metric tonnes and measures 80 meters long. The maximum output for the Burbo Bank Extension Project is 258 MW. DONG Energy's Chief Executive Officer (CEO) stated, "Burbo Bank Extension showcases the rapid innovation in the offshore wind industry. Less than ten years ago at Burbo Bank, we were the first to install Siemens 3.6-MW wind turbines and in this short time, the wind turbines have more than doubled in capacity. Pushing innovation in this way reduces the cost of electricity from offshore wind and will help to advance the offshore wind industry across the world."
The CEO of MHI Vestas stated, "The inauguration of Burbo Bank Extension represents a noteworthy milestone in the history of MHI Vestas and our stakeholders. We are extremely proud to supply 32 of our 8 MW turbines to DONG Energy and help provide renewable energy for more than 230,000 UK homes."
|
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|
|