EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

FERC Proposes NEPA Revisions to Streamline Air Quality Analyses and Accelerate Natural Gas Projects

LCG, October 16, 2026--The Federal Energy Regulatory Commission (FERC) announced on Thursday its new proposal to revise and accelerate its review of air quality effects for proposed natural gas projects under the National Environmental Policy Act (NEPA). The draft policy statement highlights revisions designed to (i) avoid unnecessary delays and duplicative analysis and (ii) deliver greater regulatory certainty and a streamlined path forward for project applicants.

Read more

AEP Announces 702-MW Bloom Fuel Cell Project to Serve Google in Wyoming

LCG, October 14, 2026--American Electric Power (AEP) today announced plans for a 20-year power purchase agreement (PPA) with Google, under which AEP will invest approximately $4 billion to advance a new 702-MW fuel cell generation project located near Cheyenne, Wyoming. Google will acquire power from Cheyenne Fuel Cell, LLC, which is approximately 92 percent owned and controlled by AEP and 8 percent owned by funds advised by Basalt Infrastructure Partners, LLP. AEP and its partners plan to start construction this year and to be fully operational by the end of 2028.

Read more

Industry News

DONG Energy Announces Opening of the Burbo Bank Extension Project with 8-MW Offshore Wind Turbines

LCG, May 23, 2017--The Burbo Bank Extension Project, a new offshore wind farm in Liverpool Bay, UK, opened on May 17 and became the first offshore wind farm to make commercial use of the MHI Vestas V164-8.0 MW wind turbines. The wind farm is a joint venture between DONG Energy (50%) and its partners PKA (25%) and KIRKBI A/S, parent company of the LEGO Group (25%).

The 8-MW wind turbines are massive, measuring 195 meters from sea level to blade tip. Each blade weighs 35 metric tonnes and measures 80 meters long. The maximum output for the Burbo Bank Extension Project is 258 MW.

DONG Energy's Chief Executive Officer (CEO) stated, "Burbo Bank Extension showcases the rapid innovation in the offshore wind industry. Less than ten years ago at Burbo Bank, we were the first to install Siemens 3.6-MW wind turbines and in this short time, the wind turbines have more than doubled in capacity. Pushing innovation in this way reduces the cost of electricity from offshore wind and will help to advance the offshore wind industry across the world."

The CEO of MHI Vestas stated, "The inauguration of Burbo Bank Extension represents a noteworthy milestone in the history of MHI Vestas and our stakeholders. We are extremely proud to supply 32 of our 8 MW turbines to DONG Energy and help provide renewable energy for more than 230,000 UK homes."
Copyright © 2026 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service