|
News
|
LCG, November 13, 2026--The U.S. Energy Information Administration (EIA) today issued an "In-Brief Analysis" highlighting the record lows for hydropower generation in the Southwest this summer. The prolonged drought conditions affecting the Colorado River Basin caused record low hydropower generation this summer in the Southwestern electricity supply region, which includes Arizona, New Mexico, and small parts of Nevada and California. Hydropower generation from April through August 2026 was a full 28 percent lower than the 10-year average and 19 percent lower than during the same period last year.
Read more
|
|
LCG, November 11, 2026--The Nuclear Regulatory Commission (NRC) announced on November 9 that it has approved the Construction Permit Application ("CPA") for the Long Mott Generating Station in Texas. Long Mott Energy, LLC (LME) must obtain a separate operating license from the NRC before loading fuel or operating the reactors.
Read more
|
|
|
Industry News
Three More Firms Join Midwest ISO
LCG, July 31, 2000--The Midwest Independent System Operator said on Friday that its board had approved three new applications for membership. The ISO now has 16 transmission-owning members and 23 members who do not own transmission facilities.Two transmission owners joining the Midwest ISO are Wisconsin Public Service Resources Corp. and American Transmission Co. A non-transmission owner, Calpine Corp. also signed up with the agency.American Transmission Co. was formed earlier this year after the Wisconsin state legislaturepassed a law requiring the state's utilities to turn over their transmission assets to an ISO. The lawwas designed to ensure that access to the state's electric transmission system would remainindependent of individual utility control as the industry embraces deregulation.Wisconsin Public Service Resources is the parent holding company for Wisconsin Public Service, a local utility. Calpine is a San Jose, Calif.-based independent power producer with operations in 27 states and Canada.The Midwest ISO claims to be the nation's largest independent transmission system operator. It says that when it becomes fully operational next year utilities with more than 52,000 miles of transmission lines, 78,000 megawatts of electric generation, and about $8 billion in installed assets will be participating in the ISO.
|
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|
|