EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

LCG Publishes 2024 Annual Outlook for Texas Electricity Market (ERCOT)

LCG, October 10, 2023 – LCG Consulting (LCG) has released its annual outlook of the ERCOT wholesale electricity market for 2024, based on the most likely weather, market, transmission, and generator conditions.

Read more

LCG Publishes 2024 Annual Outlook for Texas Electricity Market (ERCOT)

LCG, October 10, 2023 – LCG Consulting (LCG) has released its annual outlook of the ERCOT wholesale electricity market for 2024, based on the most likely weather, market, transmission, and generator conditions.

Read more

Industry News

Tampa Electric Affiliate Puts Plant On-line in Virginia

LCG, Aug. 15, 2000--An affiliate of Tampa Electric Co. threw a party yesterday morning to dedicate about half of a power plant in Accomack County, Virginia, which is across the Chesapeake Bay from the rest of the state.

The 312 megawatt Commonwealth Chesapeake Power Station is being built by Teco Power Services Corp. in two phases, and yesterdays ceremony celebrated commercial operation of the 135 megawatt first phase. The second phase is scheduled to begin production next June.

The plant was dedicated by Sen. John Warner, a Virginia Republican, and former Commerce Secretary Robert Mosbacher, whose company, Mosbacher Energy Co. is affiliated with the plants developer.

Power from the plant is sold into the PJM wholesale market, the largest centrally dispatched electricity control area in North America.

Copyright © 2024 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service