|
News
|
LCG, April 15, 2026--Suniva announced yesterday that it has entered agreements to bring a state-of-the-art 4.5 GW solar cell manufacturing facility to Laurens, South Carolina. The new facility, combined with Suniva’s existing facility at its headquarters in metro Atlanta, will bring the company’s total annual domestic solar cell manufacturing capacity to over 5.5 GW.
Read more
|
|
LCG, April 13, 2026--The EIA today released an "In-brief Analysis" of U.S. coal-fired generating capacity retirements in 2025. A highlight of the analysis is that, during 2025, the electric power sector retired 2.6 GW of coal-fired generating capacity at four power plants, which is (i) the least since 2010 and (ii) 5.9 GW less than the planned retirement of 8.5 GW at the beginning of 2025.
Read more
|
|
|
Industry News
Reliant Plans 500 Megawatt Plant for Nevada
LCG, Oct. 19, 2000--Reliant energy Inc. said yesterday that its Reliant Energy Power Generation Inc. subsidiary will build a 500 megawatt merchant power plant about 20 miles north of Las Vegas, Nev. It will be Reliant's second facility in the Las Vegas area.The natural gas-fired, combined-cycle Arrow Canyon project will be located in a canyon on a portion of private land owned by Republic Services of Southern Nevada Inc., which operates a 1,200-acre landfill at the site. Republic Services will lease a small parcel of land near the landfill to Reliant Energy for this project.According to J. Douglas Divine, senior vice president for generation development with Reliant's wholesale group, the plant will be air-cooled, using the smallest possible volumes of water. The company said it will contract with Republic Services for what water it does need under an existing water allocation.Joe Bob Perkins, president and chief operating officer of Reliant Energy Wholesale Group, said Arrow Canyon would provide power to Las Vegas, "one of the fastest growing communities in the U.S."Reliant and a partner jointly own and operate El Dorado Energy, a 480 megawatt facility southeast of Las Vegas, near Boulder City. That natural gas-fired plant began commercial operation earlier this year.
|
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|
|