EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

LCG CONSULTING PREDICTS FUTURE VALUE OF EVERY PATH AVAILABLE IN THE 2024 CAISO CRR AUCTIONS

Los Altos, September 12, 2023 — LCG Consulting, a pioneer in energy market analysis and consulting services, is proud to announce its groundbreaking prediction of the value of every path to be traded in the upcoming 2024 Annual Congestion Revenue Rights (CRR) auctions at the California Independent System Operator (CAISO).

Read more

EIA Releases A Case Study of Transmission Limits on Renewables Growth in Texas using UPLAN Model

LCG, July 13, 2023 – This paper explores the interplay between projected renewable energy additions onto the electricity grid in Texas operated by the Electric Reliability Council of Texas (ERCOT) and the region’s existing electrical transmission network.

Read more

Industry News

FPL Unit May Build 500 Megawatt Louisiana Plant

LCG, April 10, 2001The Shreveport-Bossier Port Commission in Louisiana said yesterday it is in negotiations with Florida-based FPL Energy for the company to build and operate a 500 megawatt power plant at the Red River port.

The commission said that construction on the plant could begin in the spring of 2002 and the facility could begin producing power in 2003. The expected cost of the facility is between $400 million and $500 million.

FPL Energy is a subsidiary of FPL Group Inc.

Copyright © 2023 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service