|
News
|
LCG, November 12, 2025--LCG Consulting is excited to announce the release of the MISO 2034 Data Model, built from the latest MISO Transmission Expansion Plan (MTEP). This powerful, nodal-level data model offers a forward-looking view of generation, transmission, and load forecasts across the MISO region—empowering energy professionals to explore the grid of the future with confidence.
Read more
|
|
LCG, November 12, 2025--Xcel Energy, together with the Utility Consumer Advocate (UCA), Colorado Energy Office (CEO), and Trial Staff of the Public Utilities Commission (PUC), filed a petition on November 10 requesting Commission approval to keep Comanche Generating Station Unit 2 available for up to one additional year after its currently planned retirement on December 31, 2025.
Read more
|
|
|
Industry News
PPL to Build 540 Megawatt Plant Near Chicago
LCG, April 24, 2001PPL Corp. said yesterday it plans to build a 540 megawatt simple-cycle, natural gas-fueled power plant near the University Park suburb of Chicago, at a cost of about $305 million."Increased demand for electricity in many areas of the United States is triggering an urgent need fornew generation sources," said William F. Hecht, PPL chief executive.The plant will be built in an industrial park with close access to natural gas and high-voltage transmission lines. It will use 12 combustion turbines to produce power and will be equipped with advanced emissions reduction equipment, PPL said.During construction, the plant will provide up to 150 jobs, the company said. Commercial operation is expected to begin by the summer of next year.
|
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|
|