|
News
|
LCG, November 12, 2025--LCG Consulting is excited to announce the release of the MISO 2034 Data Model, built from the latest MISO Transmission Expansion Plan (MTEP). This powerful, nodal-level data model offers a forward-looking view of generation, transmission, and load forecasts across the MISO region—empowering energy professionals to explore the grid of the future with confidence.
Read more
|
|
LCG, November 12, 2025--Xcel Energy, together with the Utility Consumer Advocate (UCA), Colorado Energy Office (CEO), and Trial Staff of the Public Utilities Commission (PUC), filed a petition on November 10 requesting Commission approval to keep Comanche Generating Station Unit 2 available for up to one additional year after its currently planned retirement on December 31, 2025.
Read more
|
|
|
Industry News
SDG&E Supports San Diego Transmission Link
LCG, Oct. 8, 2001--San Diego Gas & Electric Co. on Friday filed with the California Public Utilities Commission testimony strongly backing construction of its proposed $271 million, 31-mile Valley-Rainbow Interconnect transmission power-line.The line, which could be completed by 2005, would link SDG&E's system at Rainbow and the Southern California Edison Co. system in Romoland."Whether or not new power plants are built in the region, the construction of the proposed project remains critical to the state's future electric reliability," SDG&E said in a statement."Due to the ever-changing landscape of the state's electric picture, we decided to test the need for the 500,000-volt Valley-Rainbow Interconnect by carefully exploring several different scenarios involving the need for the line," said James P. Avery, senior vice president of fuel and power operations for SDG&E."In each case, the common conclusion was that this project is required in 2005 and grows in importance every year thereafter. In our view, SDG&E's CPUC-mandated obligation to serve its customers with a reliable source of energy must involve the construction of this project."Once completed, the Valley-Rainbow Interconnect could connect the state's sources of power with a pathway that can accommodate as much as 1,000 megawatts."Providing an enhanced electric pathway linking power sources to the north and south should help put downward pressure on electric costs by enhancing competition while bolstering reliability for all electricity users in the region," Avery said.In the event that Southern California Edison's existing 500 kilovolt transmission system is interrupted, the Valley-Rainbow Interconnect would serve as an emergency backup for southwest Riverside County, Avery added.
|
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|
|