|
News
|
By Anjuli Deb -- With deep sadness and profound appreciation, we share the passing of LCG's founder, Dr. Rajat K. Deb. He was our president and one of the first entrepreneurs in the computer revolution. He was also our friend, our teacher and mentor, and for a few of us, our father and grandfather.
Read more
|
|
LCG, June 29, 2026--Constellation announced on June 26 that it has filed license renewal applications with the Nuclear Regulatory Commission (NRC) to extend for 20 years the operations of Ginna Clean Energy Center and Nine Mile Point Unit 1 reactors in upstate New York to 2049. Constellation stated that it's decision to invest in these plants to extend their safe and reliable operations into mid-century demonstrates that New York State's renewal of its Zero Emissions Credit (ZEC) program is working as intended. Furthermore, Constellation stated that maintaining its nuclear fleet is estimated to save New Yorkers $50 billion and sustain reliable emissions-free generation resources to serve increasing electricity demands.
Read more
|
|
|
Industry News
SDG&E Supports San Diego Transmission Link
LCG, Oct. 8, 2001--San Diego Gas & Electric Co. on Friday filed with the California Public Utilities Commission testimony strongly backing construction of its proposed $271 million, 31-mile Valley-Rainbow Interconnect transmission power-line.The line, which could be completed by 2005, would link SDG&E's system at Rainbow and the Southern California Edison Co. system in Romoland."Whether or not new power plants are built in the region, the construction of the proposed project remains critical to the state's future electric reliability," SDG&E said in a statement."Due to the ever-changing landscape of the state's electric picture, we decided to test the need for the 500,000-volt Valley-Rainbow Interconnect by carefully exploring several different scenarios involving the need for the line," said James P. Avery, senior vice president of fuel and power operations for SDG&E."In each case, the common conclusion was that this project is required in 2005 and grows in importance every year thereafter. In our view, SDG&E's CPUC-mandated obligation to serve its customers with a reliable source of energy must involve the construction of this project."Once completed, the Valley-Rainbow Interconnect could connect the state's sources of power with a pathway that can accommodate as much as 1,000 megawatts."Providing an enhanced electric pathway linking power sources to the north and south should help put downward pressure on electric costs by enhancing competition while bolstering reliability for all electricity users in the region," Avery said.In the event that Southern California Edison's existing 500 kilovolt transmission system is interrupted, the Valley-Rainbow Interconnect would serve as an emergency backup for southwest Riverside County, Avery added.
|
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|
|