EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

SPP and Member Utilities Successfully Achieve Western Expansion Milestone

LCG, April 2, 2026--Southwest Power Pool (SPP) today announced that the expansion of its service territory into the Western Interconnection has been a success. The milestone makes SPP the first regional transmission organization (RTO) with services spanning the Eastern and Western Interconnections. Its member organizations, which cover all or part of 17 states, can now benefit from a more operationally and geographically diverse integrated system.

Read more

Holtec Achieves Milestone towards Restarting Palisades Nuclear Facility and Advances Plans to Build Two SMRs at Palisades Site

LCG, March 31, 2026--Holtec International yesterday announced that it successfully completed a milestone test necessary to return Holtec's Palisades Nuclear Generating Station to service. The 805-MW pressurized water reactor (PWR) is located in Michigan and was shut down by Entergy in May 2022. Holtec acquired the facility in June 2022 and has pursued a path to return the plant to service.

Read more

Industry News

Utilities, Industrials to Invest $2 Billion in Brazil Power

LCG, Dec. 3, 2001--Electricit de France and Tractebel of Belgium, as well as aluminum producers Alcoa and Billiton Metals, said on Friday during the auction of 11 hydroelectric plants, that they would invest about $2 billion in Brazil's power sector.

The companies would add 2,700 megawatts of installed capacity to Brazilian generation resources over the next six years, they said. New power plants would be built in 10 states between 2003 and 2007.

The plan would do little to alleviate the current power shortage in Brazil, but was seen as a vote of confidence in the Brazilian economy. Jose Maria Abdo, head of Brazil's regulatory agency Agencia Nacional de Energia Eletrica (Aneel), said "This is a reflection of investors' confidence in spite of the period of economic instability."

Copyright © 2026 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service