|
News
|
LCG, October 23, 2026--INNIO N.V. yesterday announced a 620 MW follow-on order from a developer and operator of mega-scale data center campuses in the United States. Together with the customer's 1.1 GW order announced previously in July, the new order brings cumulative orders from the customer to approximately 1.72 GW this year.
Read more
|
|
LCG, October 21, 2026--The Nuclear Company today announced a proposed nuclear energy campus in Kentucky that could potentially provide 6.6 GW of electric generating capacity. The Prosperity One nuclear energy campus, located along the Ohio River in eastern Kentucky, could accommodate up to six Westinghouse AP1000 reactors and would be the largest nuclear power generation site in the nation if fully constructed.
Read more
|
|
|
Industry News
Arizona Merchant Plant Construction Underway
LCG, Jan. 23, 2002--The Mesquite generating station is the second largest merchant plant now being built in Arizona.Sempra Energy Resources, a subsidiary of Sempra Energy, is developing the plant, which is expected to have the first block of its overall capacity online by the middle of 2003. The combined-cycle plant will consist of two combustion turbines and a steam turbine, and is expected to produce at maximum output by early 2004. Each of the two blocks will be rated at 625 megawatts.The Mesquite plant is located in southwestern Arizona, near Arlington. The other, largest merchant power plant being built in the state is the Gila River plant, which should be rated at 2,300 megawatts.
|
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|
|