|
News
|
By Anjuli Deb -- With deep sadness and profound appreciation, we share the passing of LCG's founder, Dr. Rajat K. Deb. He was our president and one of the first entrepreneurs in the computer revolution. He was also our friend, our teacher and mentor, and for a few of us, our father and grandfather.
Read more
|
|
LCG, July 27, 2026--Ameren Missouri, a subsidiary of Ameren Corporation, today announced plans to build the West Alton Energy Center, a combined-cycle natural gas-fired facility. The 2,100-MW power generation facility is designed to provide reliable, around-the-clock baseload power for customers while keeping costs low. Ameren anticipates a completion date of 2031, pending regulatory approval.
Read more
|
|
|
Industry News
Arizona Merchant Plant Construction Underway
LCG, Jan. 23, 2002--The Mesquite generating station is the second largest merchant plant now being built in Arizona.Sempra Energy Resources, a subsidiary of Sempra Energy, is developing the plant, which is expected to have the first block of its overall capacity online by the middle of 2003. The combined-cycle plant will consist of two combustion turbines and a steam turbine, and is expected to produce at maximum output by early 2004. Each of the two blocks will be rated at 625 megawatts.The Mesquite plant is located in southwestern Arizona, near Arlington. The other, largest merchant power plant being built in the state is the Gila River plant, which should be rated at 2,300 megawatts.
|
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|
|