News
LCG, April 24, 2025--Exxon Mobil Corporation (ExxonMobil) announced yesterday an agreement with Calpine Corporation (Calpine) to transport and permanently store up to 2 million metric tons per annum (MTA) of CO2 from Calpine’s Baytown Energy Center, a natural gas-fired facility located near Houston, Texas. This is part of Calpine’s Baytown Carbon Capture and Storage (CCS) Project that is designed to add CCS for the facility’s CO2 emissions. The Calpine facility could then provide a 24/7 supply of low-carbon electricity to the Texas grid plus steam to nearby industrial facilities.
Read more
|
LCG, April 21, 2025--NovaSource Power Services ("NovaSource") recently announced that it has partnered with Doral Renewables and has been selected as the Operations and Maintenance ("O&M") and Generator Operator ("GO") for the Mammoth Solar Project, one of the largest agrivoltaics facilities in the United States.
Read more
|
|
|
Industry News
Nuke Corrosion Costs Burden Ohio Plant
LCG, March 26, 2002-Investigations regarding regarding reactor corrosion may keep nuclear plants shut down.Boric Acid in an Ohio nuclear plant corroded the cap of the reactor, forming a significant hole. The Nuclear Regulatory Commission (NRC) ordered that 69 pressurized water reactors be inspected after the hole was found in the 25-year-old David-Besse plant. Special attention will be given to the six reactors sharing the same Babcock and Wilcox construction as the David-Besse reactor.The damaged reactor will take three months to two years to repair, depending on whether or not a new reactor head will need to be constructed. In the meantime the plant will be forced to pay ten to fifteen million dollars monthly to buy power in order to sustain its 7 percent of company FirstEnergy's total energy. Repairs will cost at least $10 million and replacing the head would cost $20 million.Midwest wholesale power prices for deliveries next summer increased by twelve percent last week, possibly caused by energy traders who fear limited energy supply.Corrosion has been found in reactor nozzles of other plants, but none of the damage is nearly as serious as that at the David-Besse reactor. Plants and generators anxiously wait for inspectors from NRC to approve their reactors.Officials say corrosion of this type poses no public risk.
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|