News
LCG, October 10, 2023 – LCG Consulting (LCG) has released its annual outlook of the ERCOT wholesale electricity market for 2024, based on the most likely weather, market, transmission, and generator conditions.
Read more
|
LCG, October 10, 2023 – LCG Consulting (LCG) has released its annual outlook of the ERCOT wholesale electricity market for 2024, based on the most likely weather, market, transmission, and generator conditions.
Read more
|
|
|
Industry News
Largest Wind Farm to be Built in Washington State
LCG, March 15, 2002-Energy Northwest announced plans to build the largest American wind farm to supply public power in the Northwest.37 turbines will comprise the 48 megawatt, $70 million endeavor. Turbines, mounted on 195 foot towers, will occupy 5,000 acres south of Kennewick, Washington. Power will be generated at wind speeds reaching 7 mph or more, although maximum capacity will be reached at 35 mph.Eight Public Utility Districts of nearby counties have invested in the project: Okanogan, Benton, Chelan, Douglas, Grant, Grays Harbor, Lewis, and Mason counties. The turbines should be constructed and running by August.
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|