EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

LCG Publishes 2024 Annual Outlook for Texas Electricity Market (ERCOT)

LCG, October 10, 2023 – LCG Consulting (LCG) has released its annual outlook of the ERCOT wholesale electricity market for 2024, based on the most likely weather, market, transmission, and generator conditions.

Read more

LCG Publishes 2024 Annual Outlook for Texas Electricity Market (ERCOT)

LCG, October 10, 2023 – LCG Consulting (LCG) has released its annual outlook of the ERCOT wholesale electricity market for 2024, based on the most likely weather, market, transmission, and generator conditions.

Read more

Industry News

Largest Wind Farm to be Built in Washington State

LCG, March 15, 2002-Energy Northwest announced plans to build the largest American wind farm to supply public power in the Northwest.

37 turbines will comprise the 48 megawatt, $70 million endeavor. Turbines, mounted on 195 foot towers, will occupy 5,000 acres south of Kennewick, Washington. Power will be generated at wind speeds reaching 7 mph or more, although maximum capacity will be reached at 35 mph.

Eight Public Utility Districts of nearby counties have invested in the project: Okanogan, Benton, Chelan, Douglas, Grant, Grays Harbor, Lewis, and Mason counties. The turbines should be constructed and running by August.

Copyright © 2024 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service