|
News
|
LCG, November 18, 2026--The SPP Board of Directors yesterday announced that it approved the 2026 Integrated Transmission Plan (ITP) at its November 17 meeting. The board authorized SPP to issue notification to construct (NTC) letters for select projects in the approved portfolio. The portfolio includes new and upgraded transmission lines designed to move more electricity across the region. SPP evaluated potential projects and worked with hundreds of stakeholders over two years to develop a portfolio designed to make the SPP system more reliable, lower costs and increase operational capabilities.
Read more
|
|
LCG, November 13, 2026--The U.S. Energy Information Administration (EIA) today issued an "In-Brief Analysis" highlighting the record lows for hydropower generation in the Southwest this summer. The prolonged drought conditions affecting the Colorado River Basin caused record low hydropower generation this summer in the Southwestern electricity supply region, which includes Arizona, New Mexico, and small parts of Nevada and California. Hydropower generation from April through August 2026 was a full 28 percent lower than the 10-year average and 19 percent lower than during the same period last year.
Read more
|
|
|
Industry News
Duke Energy to Build 1240 MW Ohio Plant
LCG, April 16, 2002-Duke Energy North America has just contracted Duke/Fluor Daniel to engineer a 1,240 MW Natural Gas plant in Ohio.The plant, which will operate in a combined-cycle configuration, is scheduled to be in service summer 2003 and will be located at the Hanging Rock Facility in Lawrence County, Ohio. Houston-based Duke Energy North America currently owns over 7,000 MW capacity and has over 10,000 MW scheduled for operation by summer next year.
|
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|
|