EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

Holtec Achieves Milestone towards Restarting Palisades Nuclear Facility and Advances Plans to Build Two SMRs at Palisades Site

LCG, March 31, 2026--Holtec International yesterday announced that it successfully completed a milestone test necessary to return Holtec's Palisades Nuclear Generating Station to service. The 805-MW pressurized water reactor (PWR) is located in Michigan and was shut down by Entergy in May 2022. Holtec acquired the facility in June 2022 and has pursued a path to return the plant to service.

Read more

Arbor Signs Agreement with GridMarket for 5 GW of Baseload Power

LCG, March 25, 2026--Arbor Energy today announced an agreement with GridMarket, an energy and infrastructure project facilitator, to deliver up to 5 GW of zero-emission power starting in 2029. GridMarket supports large energy users, including data centers, manufacturers, and logistics providers, with securing reliable and cost-effective power.

Read more

Industry News

Duke Energy to Build 1240 MW Ohio Plant

LCG, April 16, 2002-Duke Energy North America has just contracted Duke/Fluor Daniel to engineer a 1,240 MW Natural Gas plant in Ohio.

The plant, which will operate in a combined-cycle configuration, is scheduled to be in service summer 2003 and will be located at the Hanging Rock Facility in Lawrence County, Ohio.

Houston-based Duke Energy North America currently owns over 7,000 MW capacity and has over 10,000 MW scheduled for operation by summer next year.

Copyright © 2026 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service