|
News
|
LCG, November 12, 2025--LCG Consulting is excited to announce the release of the MISO 2034 Data Model, built from the latest MISO Transmission Expansion Plan (MTEP). This powerful, nodal-level data model offers a forward-looking view of generation, transmission, and load forecasts across the MISO region—empowering energy professionals to explore the grid of the future with confidence.
Read more
|
|
LCG, November 12, 2025--Xcel Energy, together with the Utility Consumer Advocate (UCA), Colorado Energy Office (CEO), and Trial Staff of the Public Utilities Commission (PUC), filed a petition on November 10 requesting Commission approval to keep Comanche Generating Station Unit 2 available for up to one additional year after its currently planned retirement on December 31, 2025.
Read more
|
|
|
Industry News
Calpine Combined-Cycle Begins Operations
LCG, April 30, 2002--A 550 MW combined-cycle operation has come on-line ahead of schedule.The Houston, Texas plant, owned by San Jose, California-based Calpine Corp., will sell steam and electricity to LYONDELL-CITGO Refining LP. According to Calpine, the system, part of the LYONDELL-CITGO's Channel Energy Center, will combust natural gas in turbines that are 40 percent more efficient than older gas-fired generators. Pre-existing operations at Channel Energy Center provided 190 MW, but the recent completion of the combined-cycle project introduced an additional 360 MW. Channel Energy Center entered operations in July of 2001 and is located along the Houston Ship Channel.
|
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|
|