|
News
|
LCG, April 15, 2026--Suniva announced yesterday that it has entered agreements to bring a state-of-the-art 4.5 GW solar cell manufacturing facility to Laurens, South Carolina. The new facility, combined with Suniva’s existing facility at its headquarters in metro Atlanta, will bring the company’s total annual domestic solar cell manufacturing capacity to over 5.5 GW.
Read more
|
|
LCG, April 13, 2026--The EIA today released an "In-brief Analysis" of U.S. coal-fired generating capacity retirements in 2025. A highlight of the analysis is that, during 2025, the electric power sector retired 2.6 GW of coal-fired generating capacity at four power plants, which is (i) the least since 2010 and (ii) 5.9 GW less than the planned retirement of 8.5 GW at the beginning of 2025.
Read more
|
|
|
Industry News
830 MW Texas Combined-Cycle in Operation
LCG, June 5, 2002--Calpine Corporation, based in San Jose, California, announced that its 830 MW Baytown Energy Center has entered into combined-cycle operations.The Texas facility, located in Baytown, generates 700 MW under base load and can provide 130 MW additional capacity when demand increases.The company says its plant results in 96 percent less nitrogen oxide emission, 99 percent less sulfur dioxide emission, and half as much carbon dioxide emission than the Texas average for power plants.Calpine has a twenty-year contract with chemical company Bayer to provide electricity and steam from the Baytown plant.
|
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|
|