|
News
|
LCG, April 13, 2026--The EIA today released an "In-brief Analysis" of U.S. coal-fired generating capacity retirements in 2025. A highlight of the analysis is that, during 2025, the electric power sector retired 2.6 GW of coal-fired generating capacity at four power plants, which is (i) the least since 2010 and (ii) 5.9 GW less than the planned retirement of 8.5 GW at the beginning of 2025.
Read more
|
|
LCG, April 10, 2026--The U.S. Environmental Protection Agency (EPA) announced yesterday a rule proposing several revisions to the federal regulations governing the disposal of coal combustion residuals (CCR) and the beneficial use of CCR. The EPA designed the rule to encourage resource recovery, allow for site-specific considerations in permitting, and provide regulatory relief while continuing to protect human health and the environment. The EPA will be accepting comments on the rule for 60 days after publication in the Federal Register, and it will also hold an online public hearing on the rule.
Read more
|
|
|
Industry News
Constellation Peaker Construction Finished
LCG, June 21, 2002--The Florida-based Oleander gas-fired peaking plant owned by Constellation Power is no longer under construction, and is scheduled to go online this summer.The plant is made up of four combustion turbines, one of which was contracted last summer to provide firm power to Florida Power & Light from 2002 through summer 2003, and another of which will was to do so through mid-2005. Part of the output has been sold to Seminole Electric Cooperative as part of a seven-year power purchase agreement beginning this winter.The plant is located in Brevard County, near Cocoa.
|
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|
|