EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

LCG Publishes 2024 Annual Outlook for Texas Electricity Market (ERCOT)

LCG, October 10, 2023 – LCG Consulting (LCG) has released its annual outlook of the ERCOT wholesale electricity market for 2024, based on the most likely weather, market, transmission, and generator conditions.

Read more

LCG Publishes 2024 Annual Outlook for Texas Electricity Market (ERCOT)

LCG, October 10, 2023 – LCG Consulting (LCG) has released its annual outlook of the ERCOT wholesale electricity market for 2024, based on the most likely weather, market, transmission, and generator conditions.

Read more

Industry News

Calpine Construction at Alabama Site Slows Down

LCG, June 27, 2002--Based upon developer Calpine Corporation's interest in increasing investor confidence, it has slowed the pace of construction at the Hillabee Enegy Center, in Alabama, according to Industrial Info.

Construction on the 770-MW cogeneration facility began last summer, while operation of the facility is now planned for December 2003, seven months later than originally planned. The plant site is near Alexander City.

The facility will consist of three Westinghouse 501G combustion turbines paired with steam recovery generators, and another steam turbine.
Copyright © 2024 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service