|
News
|
LCG, November 12, 2025--LCG Consulting is excited to announce the release of the MISO 2034 Data Model, built from the latest MISO Transmission Expansion Plan (MTEP). This powerful, nodal-level data model offers a forward-looking view of generation, transmission, and load forecasts across the MISO region—empowering energy professionals to explore the grid of the future with confidence.
Read more
|
|
LCG, November 12, 2025--Xcel Energy, together with the Utility Consumer Advocate (UCA), Colorado Energy Office (CEO), and Trial Staff of the Public Utilities Commission (PUC), filed a petition on November 10 requesting Commission approval to keep Comanche Generating Station Unit 2 available for up to one additional year after its currently planned retirement on December 31, 2025.
Read more
|
|
|
Industry News
Record Temperatures Spark Energy Conservation Requests
LCG, August 14, 2002-Both ISO New England and PJM Interconnection have asked customers to limit their electricity demand as forecasted temperatures reach record levels.New England is expected to have record high electricity demand, as is the Mid-Atlantic region.The transmission organizations, ISO-NE and PJM, have suggested methods by which customers can limit the chances of blackouts, such as using appliances in the evening and closing curtains.PJM Interconnection, delivering over 71,600 capacity, serves parts of Pennsylvania, New Jersey, Maryland, Deleware, Ohio, Virginia, West Virginia, and DC.The New England Independent System Operator (ISO) pools some 28,000 MW and serves New England states.
|
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|
|