EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

LCG Publishes 2024 Annual Outlook for Texas Electricity Market (ERCOT)

LCG, October 10, 2023 – LCG Consulting (LCG) has released its annual outlook of the ERCOT wholesale electricity market for 2024, based on the most likely weather, market, transmission, and generator conditions.

Read more

LCG Publishes 2024 Annual Outlook for Texas Electricity Market (ERCOT)

LCG, October 10, 2023 – LCG Consulting (LCG) has released its annual outlook of the ERCOT wholesale electricity market for 2024, based on the most likely weather, market, transmission, and generator conditions.

Read more

Industry News

New Mexico Has New Gas Turbine Plant

LCG, Aug. 29, 2002--A new gas-fueled generator is undergoing testing in La Mesa, N.M., in preparation for operations at the end of the year.

The Afton plant, with a capacity of 135 megawatts, was built by Public service Company of New Mexico (PNM), at a cost of $75 million. While the plant now consists of one gas turbine, there are plans to bring capacity up at an unspecified date by an additional 75 megawatts in a combined-cycle configuration, which will also improve the plant's efficiency.

The construction at Afton, twelve miles south from Las Cruces, was performed by TIC and Bibb Engineering, as Afton Power Partners. PNM spokesman Bill Real stated, "It (the plant) is also part of our promise to invest in New Mexico in order to improve the reliability of the regional power supply." A switching station at the plant site will provide access to the transmission network in the state and the West generally.
Copyright © 2024 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service