EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

PJM Reports Resources Are Adequate to Meet Growing Summer Demand

LCG, May 7, 2026--PJM issued today its Summer Outlook 2026, which forecasts sufficient generation for typical peak demand this summer. PJM states that it is prepared to call on contracted demand response resources to reduce electricity use during times of high system stress.

Read more

NRC Approves Oklo's Principal Design Criteria Topical Report for Aurora Powerhouse

LCG, May 6, 2026--Oklo Inc. ("Oklo"), an advanced nuclear technology company, announced today that the U.S. Nuclear Regulatory Commission (NRC) has approved the Principal Design Criteria (PDC) topical report for the Aurora-INL (Idaho National Laboratory) nuclear small modular reactor (SMR), which is currently under construction in Idaho. The PDC topical report establishes a regulatory framework that defines the fundamental safety, reliability, and performance requirements to guide future reactor licensing and design activities, and the approved report should simplify future applications and reduce the need to re-review established material.

Read more

Industry News

Another FirstEnergy Nuke Shut Down

LCG, September 24, 2002-FirstEnergy's Perry nuclear plant has been offline since Sunday.

According to plant officials, the plant went offline because of a false alarm, which indicated reportedly nonexistent damage to a turbine.

The plant will remain offline for a week until the alarm is repaired; meanwhile FirstEnergy's coal plants, as well as electricity bought from other companies, will replace the capacity lost by the shutdown.

FirstEnergy's David Besse plant was in the news earlier this year when corrosion of the reactor cap created a significant hole in the reactor vessel.

Copyright © 2026 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service