|
News
|
LCG, November 12, 2025--LCG Consulting is excited to announce the release of the MISO 2034 Data Model, built from the latest MISO Transmission Expansion Plan (MTEP). This powerful, nodal-level data model offers a forward-looking view of generation, transmission, and load forecasts across the MISO region—empowering energy professionals to explore the grid of the future with confidence.
Read more
|
|
LCG, November 12, 2025--Xcel Energy, together with the Utility Consumer Advocate (UCA), Colorado Energy Office (CEO), and Trial Staff of the Public Utilities Commission (PUC), filed a petition on November 10 requesting Commission approval to keep Comanche Generating Station Unit 2 available for up to one additional year after its currently planned retirement on December 31, 2025.
Read more
|
|
|
Industry News
Ontario Asks Consumers to Lower Power Usage
LCG, Mar. 3, 2003--A bout of record-setting, low temperatures in the Canadian province of Ontario has led the Independent Electricity Market Operator (IMO) to seek lower power usage by consumers and commercial enterprises.The request was made on Monday, and extends through 8 P.M. in the evening. The grid operator is issuing the plea due to low levels of reserve power made worse by the weather. If levels fall too low, the IMO might have to implement local blackouts, or risk instability of the transmission network, which could lead to loss of power throughout the system.
|
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|
|