EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

LCG Publishes 2024 Annual Outlook for Texas Electricity Market (ERCOT)

LCG, October 10, 2023 – LCG Consulting (LCG) has released its annual outlook of the ERCOT wholesale electricity market for 2024, based on the most likely weather, market, transmission, and generator conditions.

Read more

LCG Publishes 2024 Annual Outlook for Texas Electricity Market (ERCOT)

LCG, October 10, 2023 – LCG Consulting (LCG) has released its annual outlook of the ERCOT wholesale electricity market for 2024, based on the most likely weather, market, transmission, and generator conditions.

Read more

Industry News

Wisconsin Utility Plans Peaking Unit

LCG, Jan. 20, 2002--A 52-megawatt Pratt & Whitney FT8® Twinpac™ peaking generator will be purchased and installed in Kaukauna, Wisconsin in spring 2004, according to Wisconsin Public Power Inc. (WPPI), a utility owned by 37 municipalities.

The president and CEO of WPPI, Roy Thilly, said, "This project will provide a low-cost, reliable and environmentally sound electric generating source needed to meet load growth in our member communities." The FT8 turbine is a variant of the JT8D aircraft engine.

The installation will also allow three older diesel units, which provide about 7 megawatts, to be retired. "We are pleased to be working with WPPI and look forward to providing them with exceptional customer service," Ellen Smith, president of Pratt & Whitney Power Systems, stated.
Copyright © 2024 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service