EnergyOnline
Services

RSS FEED

EnergyOnline.com rss

News

In Memory of Rajat Deb: Inspiring Man of Ideas and Remarkable Silicon Valley Archetype

By Anjuli Deb -- With deep sadness and profound appreciation, we share the passing of LCG's founder, Dr. Rajat K. Deb. He was our president and one of the first entrepreneurs in the computer revolution. He was also our friend, our teacher and mentor, and for a few of us, our father and grandfather.

Read more

Avantus and Clean Power Alliance Sign PPA for 200-MW Solar Plus Storage Facility for Southern California Communities

LCG, July 13, 2026--Avantus, an independent power producer (IPP), and Clean Power Alliance (CPA) today announced a 20-year power purchase agreement (PPA) for the Rexford 2 solar and storage project in Tulare County, California. The project will deliver 200 MWac of solar power combined with a 200 MW/800 MWh of battery energy storage system (BESS) to the California grid. The project is scheduled to commence construction in 2027 and achieve operations in late 2028. Commercial operations under the PPA are scheduled to start in May 2029. Avantus plans to own and operate facility.

Read more

Industry News

FERC to Require Reporting When Reliability Standards Not Met

LCG, Dec. 17, 2003--The Federal Energy Regulatory Commission (FERC) intends to require that utilities report instances in which they fail to meet voluntary standards set by the North American Electric Reliability Council.

The Chairman of FERC, Pat Wood III, said that as long as the scope of FERC's authority to enforce standards remains in doubt because of the stalled energy legislation in Congress, requiring reporting would be a first step before NERC's voluntary standards could become legally binding. The reporting requirement could become effective before summer, Wood told the agency.

In addition to the reporting requirement, for which support has been expressed by other commissioners as an initial step in improving reliability, FERC might undertake audits of utility performance. The audits could be used to verify compliance by individual utilities.
Copyright © 2026 LCG Consulting. All rights reserved. Terms and Copyright
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
Uniform Storage Model
A Battery Simulation Model
UPLAN-ACE
Day Ahead and Real Time Market Simulation
UPLAN-G
The Gas Procurement and Competitive Analysis System
PLATO
Database of Plants, Loads, Assets, Transmission...
CAISO CRR Auctions
Monthly Price and Congestion Forecasting Service