|
News
|
LCG, May 18, 2026--The U.S. Secretary of Energy today issued an emergency order to address critical grid reliability issues in the Midwest anticipated this summer. The order is in effect beginning on May 19, 2026, through August 16, 2026. The emergency order directs the Midcontinent Independent System Operator (MISO), in coordination with Consumers Energy, to ensure that the J.H. Campbell coal-fired power plant (Campbell Plant) in West Olive, Michigan shall take all steps necessary to remain available to operate and to minimize costs for the region.
Read more
|
|
LCG, May 14, 2026--The U.S. Environmental Protection Agency (EPA) announced today that it is proposing a rule to revise wastewater limits, known as effluent limitations guidelines (ELG), for steam electric power plants that will help improve grid reliability and lower electricity prices while continuing to support clean and safe water resources. If finalized, the EPA's proposal is estimated to reduce electricity generation costs by as much as $1.1 billion annually, which could provide cost-savings to American consumers.
Read more
|
|
|
Industry News
Heat Leads to ISO Alert for California
LCG, May 30, 2003--Power demand in California surpassed forecasts easily on Wednesday, due to high temperatures that required an estimated weather-related 3,800 megawatts over expected load, and another 700 megawatts more because of forecast error and a lack of conservation.The Independent System Operator, which operates the state's power grid, issued a Stage 1 power alert lasting from 3 P.M. to 6 P.M. A Stage 1 emergency is called when generation reserves drop below 7 percent. Power consumers are asked to cut back on use of heavy appliances at such times, although air conditioners were active in both Northern and Southern California.Jim McIntosh, the head of grid operations, was quoted in the Sacramento Bee: "I don't think we saw much of any conservation yesterday." The approaching summer is expected to be warmer than usual, and could be marked by frequent alerts if conservation is minor, or if the demand patterns signal permanent underlying load growth, not just the effects of Wednesday's sudden bout of warm weather.
|
|
|
|
UPLAN-NPM
The Locational Marginal Price Model (LMP) Network Power Model
|
|
|
UPLAN-ACE
Day Ahead and Real Time Market Simulation
|
|
|
UPLAN-G
The Gas Procurement and Competitive Analysis System
|
|
|
PLATO
Database of Plants, Loads, Assets, Transmission...
|
|
|
|
|